Idaho is live • Built for Idaho CGP workflows

Idaho SWPPP generator (Idaho CGP)

Auto-SWPPP helps you generate an Idaho SWPPP aligned to the Idaho Construction General Permit (CGP). You review a narrative PDF preview before checkout. After purchase, we finalize and deliver the full SWPPP PDF package for construction stormwater compliance.

For operators, contractors, and consultants who need permit-practical documentation and a clean workflow.
What you get
Preview first. Final package after purchase. Built around Idaho CGP expectations.
Narrative PDF preview Before checkout: confirm scope and key details.
Final SWPPP PDF package After purchase: finalized plan + logs aligned to the Idaho CGP.
Compliance-practical Clear inspection, stabilization, corrective action, and recordkeeping expectations.
Built for real projects Designed for field use and review—not academic templates.

What an Idaho SWPPP should cover (high level)

  • Site + operator details, project description, and responsible parties.
  • Stormwater + erosion controls appropriate to soils, slope, and phasing.
  • Inspections with permit-aligned cadence and documentation.
  • Stabilization expectations and how inactivity is managed.
  • Corrective actions (what triggers action, how it’s tracked, and closure).
  • Recordkeeping (SWPPP, amendments, inspection reports, logs, and supporting docs).
For field-level guidance, use the Training & Resources hub.

How Auto-SWPPP fits into the workflow

  • Enter project details in the app (site, soils, receiving waters, inspections, BMPs, etc.).
  • Review a narrative PDF preview before checkout to confirm scope and key details.
  • Checkout and provide any needed supporting files (mapping or site exhibits, if required).
  • Receive the finalized SWPPP PDF package aligned to the Idaho CGP. Typical target is ~24 hours for straightforward projects; complex sites take longer.